# Requirements
1. Securely fix rail to rest of assembly
2. Maintain rail parallelism to prevent sled binding
3. Securely retain spring within the connector
4. Withstand launch forces
5. Avoid interference with the sled, linear bearings, springs, and other launcher components
# Design 1
- Relies on purchased component for rail fixture
- Not thick enough to withstand force
- Can't ensure screw holes thru PVC tubes align such that the rails will be parallel?
# Design 2
- More room for error in aligning axes to be parallel since the connectors aren't directly connected
- Spring isn't directly fixed to connector, it's snap fit to the bored hole
- Can't ensure screw holes thru PVC tubes align such that the rails will be parallel?
# Design 3
> Combines ideas from designs 1 & 2
- Fits **around** the PVC tubing rather than thru -> allows us to drill holes that'll correctly align the connectors
- Spring fixed directly to connector via zip ties
- Improved rail alignment system
-